Standard Reference Values #civilengineer

 Standard Reference Values


Height of residential building – 3 m


Height of individual storey – 1.5 m


Width of roads – 3 m (typical minimum lane width; arterial roads are wider)


Height of parapet wall – 1 m


Width of staircase in building – 0.9 m (minimum clear width)


Thickness of one brick cement plaster – 12 mm


Density of cement – 1440 kg/m³


Volume of cement per m³ of 1:5 mortar – 0.167 m³


Quantity of cement bags in 1 m³ of 1:5 mortar – 4.18 bags


Bulk density of cement – 1440 kg/m³


Specific gravity of cement – 3.15


Bulk density of fine sand – 1450 kg/m³


Bulk density of coarse sand – 1600 kg/m³


Size of coarse aggregate – 20 mm


Bulk density of aggregate – 1650 kg/m³


Specific gravity of aggregate – 2.6


Water–cement ratio for plain concrete – 0.45–0.6 (acceptable range)


Rate of water absorption for brick – 20%


Porosity of brick – 25%


Crushing strength of brick – >75 kg/cm² (min. for class designation)


Unit weight of mild steel – 7850 kg/m³


Yield strength of mild steel – 250 MPa


Modulus of elasticity of steel – 200 GPa


Poisson’s ratio for steel – 0.3


Ultimate strength of high‐yield steel – 460 MPa


Minimum reinforcement cover in beams – 25 mm


Minimum reinforcement cover in slabs – 20 mm


Minimum reinforcement cover in columns – 40 mm


Minimum reinforcement cover in footings – 75 mm


Maximum diameter of bars in slabs – 8 mm (or ≤ slab thickness/8)


Maximum diameter of bars in beams – 16 mm


Maximum diameter of bars in footings – 20 mm


Clear cover for RCC elements – 20 mm (depends on exposure)


Water–cement ratio for grade M20 concrete – 0.5 (typical) 


Nominal mix ratio for M20 – 1:1.5:3 


Cement content in M20 – ≈330 kg/m³ 


Maximum aggregate size in M20 – 20 mm


Workability (slump) of M20 – 75–100 mm 


Characteristic strength of concrete at 28 days for M20 – 20 MPa


Autoclave efficiency (for AAC blocks) – 70–75%


Compressive strength of AAC blocks – 3.5–7.5 N/mm²


Dry density of AAC blocks – 600–800 kg/m³


Thermal conductivity of AAC – 0.17–0.21 W/m·K


Minimum number of bars used for square column – 4 bars


Minimum number of bars used for circular column – 6 bars


Maximum diameter of bars used in slabs – ≤ (thickness/8)


Maximum diameter of bars used in each bay – 10 mm


Max cover of reinforcement in RCC pile cap – 50 mm


Dimensional tolerance of cube – ±1.25 mm


Final setting time of cement – ≤10 hours


Initial setting time of cement – ≥30 minutes


Standard consistency of cement – 30% water


Specific gravity of PPC – 2.75


Specific gravity of slag – 2.9


Bulk density of PPC – 1120 kg/m³


Bulk density of slag – 1200 kg/m³


Water demand of PPC – 27%


Water demand of slag – 29%


Yield strength of grade M25 steel – 500 MPa


Compressive strength of grade M25 concrete – 25 MPa


Modulus of rupture of grade M25 concrete – 3.5 MPa


Tensile strength of concrete at 28 days – 2.5 MPa


Elastic modulus of concrete – 25 GPa


Poisson’s ratio of concrete – 0.2


Minimum diameter of bars used in T‐beam flange – 12 mm


Minimum diameter of bars used in T‐beam web – 10 mm


Minimum diameter of bars used in stair slab – 8 mm


Minimum diameter of bars used in raft foundation – 12 mm


Minimum diameter of bars used in strip footing – 10 mm


Minimum diameter of bars used in pile – 16 mm


Minimum number of bars used for square column – 4 bars


Minimum number of bars used for circular column – 6 bars


Maximum diameter of bars used in slabs – ≤ (thickness/8)


Maximum diameter of bars used in each bay – 10 mm


Max cover of reinforcement in RCC pile cap – 50 mm


Minimum tensile strength of steel – 415 MPa


Characteristic strength of steel at yield – 460 MPa


Compressive strength of grade M30 concrete – 30 MPa


Flow of concrete mixture – 60–140 mm (flow table)


Final setting time of PPC – 0.5–2 hours


Initial setting time of PPC – 15–30 minutes


Light sand grading zone for RCC – Zone II


Coarse sand grading zone for plaster – Zone I


Flight height of bucket elevator – not specified


Cement content in M20 is typically 310–330 kg/m³ rather than 403 kg/m³ .


Slump for M20 is 75–100 mm, not 25–75 mm .


Maximum diameter in slabs should reference slab thickness (≤ thickness/8) rather than a fixed 8 mm.